Envoy-S Installation and Operation
2015 Enphase Energy Inc. 141-00027 Rev 01
17
Select wire that is Code type, NRTL certified, and rated for voltage and temperature for the specific
application. Mechanically protect the wires in a Code type, NRTL certified conduit or raceway. Use NRTL
certified connectors for splices and insulated splices from one another and from the raceway, conduit, or
junction box, if metallic.
Buried wires must be NRTL certified for direct burial and follow the Code for installation. Do not bury splices
unless in a NRTL certified junction box rated for the application, and use an NRTL certified moisture resistant
connection method.
4. Energize the Envoy-S
a. Close the terminal block door, and secure it with the screw.
b. Turn on the circuit feeding the Envoy-S.
c. All four LEDs flash amber during boot up. This typically takes 2 to 3 minutes. When boot up is
complete, the Microinverter Communications LED flashes amber indicating that that
microinverters are not yet detected.