Envoy IQ Installation
Table Of Contents
- Enphase IQ Envoy
- Contact Information
- FCC Compliance
- Other Information
- This Class B digital apparatus complies with Industry Canada ICES-003.
- For third-party license information, refer to enphase.com/licenses.
- For Enphase patent information, refer to enphase.com/company/patents/.
- For warranty text, refer to enphase.com/warranty.
- Copyright © 2017 Enphase Energy Inc. All rights reserved.
- Audience
- Table of Contents
- SAFETY
- The Enphase IQ Envoy
- Installation Planning and Preparation
- Review the following pre-installation checks before you install the IQ Envoy.
- To install the production CT
- Installing the IQ Envoy – Part 1
- Installing the IQ Envoy – Part 2
- Use one of the following methods to detect devices (Enphase Microinverters and/or Enphase Batteries).
- IQ Envoy Operation
- You can track system installation progress with the Enphase Installer Toolkit mobile app.
- Connecting to IQ Envoy
- Once your mobile device and the Envoy are on the same LAN, you can connect to the IQ Envoy.
- Refer to enphase.com/installer-toolkit/ for more information on the Enphase Installer Toolkit.
- Select Diagnostic Tools to ping the Envoy, check network connectivity, and check the network route.
- Troubleshooting
- The following sections describe possible problems and solutions.
- Troubleshoot power line communication issues as follows.
- This means that communications from other Envoy(s) have been detected. To prevent this issue:
- Check for the following conditions.
- If Enphase Customer Support authorizes an IQ Envoy replacement (RMA), perform the following steps.
- Technical Data
IQ Envoy Installation and Operation
© 2017 Enphase Energy Inc. 141-00039 Rev 01
44
Technical Data
Model Numbers
IQ Envoy
ENV-IQ-AM1-240
Enphase
IQ Envoy communications gateway with integrated revenue-grade PV
production metering (ANSI C12.20 +/- 0.5%) and optional consumption monitoring
(+/- 2.5%).
Accessories (order separately)
Enphase
Mobile Connect
[Enphase CELLMODEM-01 (3G)
or CELLMODEM-03 (4G)]
Plug and play industrial grade cellular modem with five-year data plan for systems
up to 60 microinverters. (Available where there is adequate cellular service in the
installation area.)
Consumption Monitoring CT
CT-200-SPLIT
Split-core current transformers enable whole home consumption metering (+/- 2.5%).
Wire / Power Requirements / Power Specifications
Power requirements
120/240 VAC or 208Y/120 VAC, 0.22 A, 60 Hz, OVC III.
When hard wired and installed in an enclosure, the supply wiring must be 12-14
AWG copper rated to 75 degrees C or better, and it must be protected by a
maximum 20 A breaker
Relay contacts
240 VAC, OVC II
Pilot duty, B300 (240 V or 120 V, 360 VA)
CT leads
The production CT leads are 1.5m long, 18AWG, and are rated for 200A
The , 18AWG, and are rated for 200A
Typical power draw
3 W
Capacity
Number of microinverters polled
Up to 600
Mechanical Data
Dimensions (WxHxD)
Weight
17.6 oz. (498 g)
Environmental Data
Ambient temperature range
-40° to 65° C (-40° to 149° F)
-40° to 46° C (-40° to 115° F) if installed in an enclosure
Relative Humidity
95%
Environmental rating
IP30. For installation indoors or in an NRTL-certified, NEMA type 3R enclosure
Altitude use
To 2000 meters (6560 feet)
Cooling
Natural convection