Envoy IQ Installation

Table Of Contents
IQ Envoy Installation and Operation
© 2017 Enphase Energy Inc. 141-00039 Rev 01
43
 
BEST PRACTICE: When powered up and connected for the first time, the IQ Envoy may
retrieve an automatic update from Enphase. This update may take up to 15 minutes. During
the update the IQ Envoy LEDs flash green sequentially.
WARNING! Risk of Equipment Damage. Do not remove power from the IQ Envoy if the IQ
Envoy LEDs are flashing green sequentially. This indicates that a software update is in
progress.
 
  

 

 


NOTE: If the old IQ Envoy has communicated to the microinverters on the same day that the
new replacement IQ Envoy is installed, the new IQ Envoy will be unable to discover the
microinverters. Contact Enphase at enphase.com/en-us/support/contact for assistance in
this situation.
 


 -

 