Issue: No Microinverters are Reporting

Has a device scan been run while the array was active? A device scan may have been run while the
array was not connected to the grid or when the array was not powered by sunlight.





Is the Envoy well located? The Envoy must be near the primary load center or the array's downstream
subpanel.



-

Is the system energized? PV modules power microinverters, PV modules provide power only during
daylight hours, and microinverters communicate only when powered.





Is there a phase imbalance?


Is the IQ Envoy wired to a circuit on the primary load center while the PV circuit breakers are on a
downstream subpanel? 
circuit breakers.


Issue: Installer Toolkit Indicates that Scanning is Inhibited
It is best to leave the Envoy in this condition for normal operation. However, if you need to re-enable
scanning (for example, if you replace a microinverter) contact Enphase Customer Support at
enphase.com/en-us/support/contact.
Power Production Issues
Issue: Power Production LED is solid amber
The Power Production LED is solid green when all microinverters are producing, flashes green when a
microinverter update is in progress, flashes amber when microinverters are not yet detected, or becomes
solid amber when any microinverter that is expected to produce does not. Use Installer Toolkit to see which
microinverters are affected.


