Technical Brief for Installation of Consumption Monitoring
Table Of Contents
- Assessing a Site for Installation of Consumption Monitoring
- For North America and Latin America
- About the Enphase Envoy-S Metered
- About Consumption Monitoring
- Consumption Current Transformers
- Site Assessment Form
- Circuit Detail Form
- 200A Consumption CT Dimensions
- Location of the Envoy-S Metered
- Installation of Consumption CTs
- Installing CTs in a simple scenario
- Installing CTs in Eaton Service Panels / Solar Power Center
- Installing Multiple Conductors in a Single CT
- Installing Parallel Connected CTs for 400A Services and Crowded Service Panels
- Calculating Whether Multiple Conductors Fit Within a CT
- Example Calculations for a Service Panel
- Retrofitting the Electrical Service for CT Installation
- Extending the Consumption CT Conductors
- Net Consumption versus Total Consumption
- Monitoring with the Installer Toolkit Mobile App
- Troubleshooting
- Viewing Sites with Consumption Monitoring
Installing Consumption CTs
2016 Enphase Energy Inc. All rights reserved. January 2016
4
200A Consumption CT Dimensions
The split-core consumption CTs open and clamp around an existing conductor or busbar without rewiring.
The CTs accommodate conductors up to 4/0 RHW, 350MCM THWN, 350MCM XHHW, or busbars up to 0.75
inches, which is adequate for 200A services.










