ISWITCH MULTIBOX OFF LINE
ISWITCH MULTIBOX OFF LINE system’s starting up
CONNECTION & TEST:
1.- Check that the iSWITCH Energy saver is connected according to the
connection diagram.
2.- Power on to the Energy saver.
3.-Check the pilots are green steadily.
4.- Introduce the construction card and check that pilots turn off and that the 2
relays are on.
Remove the construction card and check that the green pilots blink and that the
relays turned off after one minute thus leaving the units with the position pilots on
(green) .
UNIT INITIALIZATION:
5.- Introduce the programming card (created according to the specifications),
check that the green lights turned off.
6.- Remove the card from the energy saver and check that the unit makes a set of
lights (red-green)alternatively, during the set of lights introduce the hotel card, the
unit will turn the lights off and the relays will go on depending on the type of card
introduced.
The card will be initialized with the card’s installation number and the construction
card will no longer work.
In order to configure other parameters in the unit (courtesy time) the special cards
created for that will be used.
NOTE: The construction card used before the energy saver’s starting up will be
useless after the initialization.
NOTE: This starting up process has to be done only the first time that the units are
installed.