Use and Care Manual
Burner tube replacement
REPLACINGCOMPONENTS
Therearethreedifferentburnertubesinthetopofthestove. Toreplaceatube,first
besurethatyouorderthecorrecttubeyouneedtoreplace. Thenusinga5/16”socketor
openendwrench,removethescrewlocatedontheleftsideofthetube. Besuretokeepthe
screw.
Push the tube to the right then remove the tube (pulling the tube back to the left
after that side
has been removed from the hole). To replace, reverse the above
procedure...makesuretoinstallthetubesinthecorrectorder.(FronttoBack)
Ceramic fiberboard replacement
Therearefourfiberboards
locatedinthetopofthisstove,in
twolayers.Whilethebottomlayeris
oriented‘North/South’asshown,the
toplayerisoriented‘East/West’.To
replaceacrackedorbrokenboard,
firstremovethefrontburner
tube. Thenremovetheboardyou
needtoreplac e. Installthenew
board(theboardsshouldsitflush
togethersidebyside). Replacethe
tubepreviouslyremoved.
Dogboxreplacement
SeeBrickLayout(page34)fordogboxlocationinthefirebox.
Toreplacethedogbox,firstremovetheashpan.Thenremovethetwo9/16”
nutsthatholdthecarriageboltsinplace.Openthefrontdoorofthestoveandliftup
onthedogbox.Installneworexistingcarriageboltsintotheholesontheflangeofthe
dogboxandre‐installinthereversemannerinwhichitwasremoved.
Heatshieldremoval
Therearetwo5/16”screwsthatareontherearoftheheatshield. Toremovetheheat
shield,usinga5/16”socketoropenendedwrench,removethetwoscrews. Thenpulltheheat
shieldupandbackoffthebackpanel.
FiberBoards
(white)
BurnerTubes
25