Installation Instructions

4
©2021 Trane Technologies
TK 61990-11-IS
Installation Best Practices
IImmppoorrttaanntt:: BEFORE beginning the installation disconnect all power to the refrigeration unit
including standby power (if equipped).
Familiarize yourself with the components to be installed.
Plan the layout and wire routing prior to permanently mounting any components.
Make sure wire routes are free from abrasive materials and have adequate clearance from
hot surfaces.
Holes used for routing harnesses through metal frames, skins or structures should be
smooth and non-marring and lined with a grommet.
Remove fuse (located on the harness) prior to installation.
Follow installation instructions specific to your installation kit and model refrigeration unit.
Electrical harnesses routed inside the refrigeration unit must be secured to other harnesses
or to a solid frame structure with insulated clamps or band wraps to prevent making contact
with rotating or hot components.
DO NOT attach electrical harnesses to copper tubing, exhaust components or fuel lines.
Test Procedures must be performed to complete the installation.
Fill out the Warrant Registration Form after completing the installation.