Installation Instructions
Table Of Contents
4
©2021 Trane Technologies
TK 61990-11-IS
Installation Best Practices
IImmppoorrttaanntt:: BEFORE beginning the installation disconnect all power to the refrigeration unit
including standby power (if equipped).
• Familiarize yourself with the components to be installed.
• Plan the layout and wire routing prior to permanently mounting any components.
• Make sure wire routes are free from abrasive materials and have adequate clearance from
hot surfaces.
• Holes used for routing harnesses through metal frames, skins or structures should be
smooth and non-marring and lined with a grommet.
• Remove fuse (located on the harness) prior to installation.
• Follow installation instructions specific to your installation kit and model refrigeration unit.
• Electrical harnesses routed inside the refrigeration unit must be secured to other harnesses
or to a solid frame structure with insulated clamps or band wraps to prevent making contact
with rotating or hot components.
• DO NOT attach electrical harnesses to copper tubing, exhaust components or fuel lines.
• Test Procedures must be performed to complete the installation.
• Fill out the Warrant Registration Form after completing the installation.