Installation manual

27
2.5 HOT AIR DUCTING INSTALLATION
Different hot air ducting systems can be installed with the ENERZONE SOLUTION 2.5ZC:
Gravity kit
Forced air kit
2.5.1 Gravity Kit
The kit includes:
2 x hot air outlets (grilles and frames);
2 x 90
o
elbows with brackets;
1 deflector.
The gravity kit allows you to block the upper fireplace louver. To do so, follow the steps
below:
a) Remove the upper louver from the fireplace;
b) Install the deflector as shown on figure 20;
c) Put the upper louver back into place.
Figure 20 Figure 21
The safety rules for hot air ducting gravity kit installations are the following:
Minimum height* 68" (1.7 m)
Maximum length 10' (3m) (see figure 22)
*The minimum height of the hot air ducting must be measured from the floor to the top of the
hot air grilles.