Specifications

Solution 1.8 Installation and Operation Manual 43
Pedestal kit installation:
Follow step 1, 2 and 3 of the leg kit
installation.
5- Secure pedestal base to the underside
of the firebox using the bolts, washers
and nuts removed in step 3.
Note: Insert each bolt from the inside of the
firebox, this will allow the bricks to sit more
evenly on the floor of the firebox.
6- Gently flip the stove back on its
pedestal making sure not to put too
much weight on the rear edge of the
base.
7- Secure the air control cover to the
brackets under the ash lip with 2 screws
then install the coil handle on the control
rod by turning it counterclockwise.
8- Secure the pedestal backing panel to
the rear of the pedestal.
9- Open the ash drawer lid then slide it into
the front opening of the pedestal.
10- Position the stove for its installation and
reinstall the door and the bricks (see
Appendix 8: Exploded Diagram and
Parts List for layout).
Note: Make sure that baffle components
have not moved during the leg installation
process since a flue blockage may occur.