5 Maintenance and troubleshooting
5.1 Spanner replacement (Fig M)
Remove drive unit from cassette.
Loosen and remove
set screw (17).
• Tap
spanner pin (18) on one end and
remove it from the cassette.
Slide spanner (1) out of cassette
housing.
Apply a thin coat of molybdenum
disulphide lubricant
to the sides
of the new spanner and to the
spring
pin
at top of spanner.
Slide new spanner (1) into cassette
housing. Align hole in spanner with
mating holes in sideplates.
• Install
spanner pin (18) through holes.
Before installation, be sure that flat
area of pin is aligned with
set screw
hole in spanner.
Apply a small amount of Loctite 243
to threads of
set screw (17).
• Reinstall
set screw (17).
5.2 Preventative maintenance (Fig N & O)
Preventative maintenance can be
carried out by the user. Full
maintenance must be carried out by
an approved and authorized
technician appointed by Enerpac.
Recommended service intervals are:
a) 3 months – Heavy Duty use
b) 6 months – Normal use
c) 12 months – Infrequent use
- Non destructive testing must be
carried out if the tool has been used
under severe conditions.
5.2.1 The roller cassette
Remove drive unit from cassette.
• Remove
the shoulder screws (20). Lift
and remove the sideplate (21).
Remove spanner (1),
spanner pin (18)
and
set screw (17) as an assembly.
• Remove
reaction roller bracket pin
(22) and reaction roller bracket (23).
Fig. N
Fig. M