Installation manual

System Display/Programming Modes
The 9312s Main and System Loops are shown below. These settings apply to those units with Version 3.1 software.
Main Loop Description Allowable Range
id Instantaneous Demand N/M
Ad Average Demand N/M
Pd Peak Demand N/M*
dL On-Peak Demand Limit 2.0-49.5 (4-99 in 80 KW Mode)
CL Clock - Current Time 12:00 a.m.-11:59 p.m.
System Loop Description Allowable Range
dE Temperature - degrees N/M
do Day of the Week 1-7
dA Date - Month/Day 1/1-12/31
Yr Year 1992-2090
dS Auto Daylight-Saving Adjust 0, 1, 2
ns Number of Seasons 0-4
A1 Winter 1 Start Time 12:00 a.m. - 11:59 p.m.
A2 Winter 1 End Time 12:00 a.m. - 11:59 p.m.
A3 Winter 2 Start Time 12:00 a.m. - 11:59 p.m.
A4 Winter 2 End Time 12:00 a.m. - 11:59 p.m.
Ad Winter Start Date 0/0-12/31
U1 Spring 1 Start Time 12:00 a.m. - 11:59 p.m.
U2 Spring 1 End Time 12:00 a.m. - 11:59 p.m.
U3 Spring 2 Start Time 12:00 a.m. - 11:59 p.m.
U4 Spring 2 End Time 12:00 a.m. - 11:59 p.m.
Ud Spring Start Date 0/0-12/31
S1 Summer 1 Start Time 12:00 a.m. - 11:59 p.m.
S2 Summer 1 End Time 12:00 a.m. - 11:59 p.m.
S3 Summer 2 Start Time 12:00 a.m. - 11:59 p.m.
S4 Summer 2 End Time 12:00 a.m. - 11:59 p.m.
Sd Summer Start Date 0/0-12/31
F1 Fall 1 Start Time 12:00 a.m. - 11:59 p.m.
F2 Fall 1 End Time 12:00 a.m. - 11:59 p.m.
F3 Fall 2 Start Time 12:00 a.m. - 11:59 p.m.
F4 Fall 2 End Time 12:00 a.m. - 11:59 p.m.
Fd Fall Start Date 0/0-12/31
SS Saturday/Sunday On/Off-Peak on/oFF
H1 Holiday 1 0/0-12/31
H2 Holiday 2 0/0-12/31
H3 Holiday 3 0/0-12/31
H4 Holiday 4 0/0-12/31
H5 Holiday 5 (Presidents Day) 0/0-12/31, oFFP, onP
H6 Holiday 6 (Memorial Day) 0/0-12/31, oFFP, onP
H7 Holiday 7 (Labor Day) 0/0-12/31, oFFP, onP
H8 Holiday 8 (Thanksgiving Day) 0/0-12/31, oFFP, onP
H9 Holiday 9 (Friday after Thanksgiving) 0/0-12/31, oFFP, onP
oP Off-Peak Peak Demand N/M*
oL Off-Peak Limit 2-49.5, 4-99, oFF, oFF2, oFF3, oFF4, oFF5
HL High Instantaneous Limit 2-49.5, 4-99, oFF
nr # of Relays (Loads) Connected 1 to 16
Pr_1 Priority - Load #1 1 to 17
Pr_2 Priority - Load #2 1 to 17
Pr_3 Priority - Load #3 1 to 17
Pr_n Priority - Load #n 1 to 17
on_1 Minimum On-Time for Load #1 0-20 minutes
on_2 Minimum On-Time for Load #2 0-20 minutes
on_3 Minimum On-Time for Load #3 0-20 minutes
on_n Minimum On-Time for Load #n 0-20 minutes
oF_1 Minimum Off-Time for Load #1 0-20 minutes
oF_2 Minimum Off-Time for Load #2 0-20 minutes
oF_3 Minimum Off-Time for Load #3 0-20 minutes
oF_n Minimum Off-Time for Load #n 0-20 minutes
dC Demand Control Algorithm 1-4
AP Averaging Period 15, 30 or 60-minutes
dr Demand Range 40 or 80
*Can reset to 0 but the recorded number is non-modifi able
15