Installation manual
13
Chart A: Baseboard Heated Home
Load Control Strategy: Combination Fixed/Rotate
Priority Shed Sequence Load Demand
1 (highest) Last Dryer (heating
elements only)
5.5 kW
2 Second Water Heater 4.5 kW
3 (lowest) First* Living Room Heat 3.5 kW
3 (lowest) First* Basement Heat 4.0 kW
3 (lowest) First* Entry Heat 1.5 kW
3 (lowest) First* Bedroom Heat 2.0 kW
3 (lowest) First* Bedroom Heat 2.0 kW
3 (lowest) First* Family Room Heat 3.0 kW
Chart B: Typical Heat Pump/Air Conditioner Home
Load Control Strategy: Fixed Priority
Priority Shed Sequence Load Demand
1 (highest) Last Dryer (heating
elements only)
5.0 – 5.0 kW
2 Seventh Compressor #1 3.0 – 7.0 kW
3 Sixth Compressor #2 3.0 – 7.0 kW
4 Fifth Water Heater 4.5 kW
5 Fourth Strip Heat #1
Electric Furnace
5.0 kW
6 Third Strip Heat #2
Electric Furnace
5.0 kW
7 Second Strip Heat #3
Electric Furnace
5.0 kW
8 (lowest) First Strip Heat #4
Electric Furnace
5.0 kW
*NOTE: Shedding sequence of rotating loads begins with the load which has been
restored the longest. When all #3 priority loads are all shed, the #2 priority load is shed
next, #1 priority load is shed last, if necessary.