System information

Enecsys Installation and Operation Manual Version 1.6June 6 2012
45
numbers will automatically be reporting on the list of available serial numbers.
The installer will need to drag each inverter serial number to the appropriate
module. Refer to the PV module / micro inverter serial number form” that was filled
with stickers during the installation for their positions in the array design.
Step 3: Check work and launch installation
When you are finished with dragging the available serials to the modules, save and
finish. You will arrive on the PENDING INSTALLATIONS Screen.
Inspect the information categories for green check marks. If there is an “x” in a
column, it means that the information is not complete. Click on the button to add
the required information.
If all the information is complete and correct, select the red GO LIVE button on
the right.
After you have set the installation live, click CONFIRM.
As soon as the physical installation is completed, the inverters start sending
messages to the gateway and the new system can be seen on the monitoring
website.