System information
Enecsys Installation and Operation Manual – Version 1.6 –June 6 2012
40
Step 3: Input the system information.
• System information describes the PV system: Type, Number of Modules, number
of inverters, Mounting system, and Roof Type are entered here.
• “Total cost of system” and “Feed in Tariff” are used to calculate report values.
Step 4: Add gateway serial number(s).
• At this point, you will be entering a serial number for each gateway used. Note that
the inverter serial numbers will auto-populate as the installation is finalized.
• Note that the user interface says “You will need one gateway for every fifty
inverters”: larger installations may use multiple gateways.