System information
Enecsys Installation and Operation Manual – Version 1.6 –June 6 2012
37
❺b#Duo micro inverter:#
Connect both Y connectors to the appropriate micro inverter DC link cable
connectors until they snap lock.
Connect the DC link cables from the PV modules to the micro inverter Y
connectors.
Never disconnect the DC link cables when under load.
The system does not have to be fully commissioned for the cables to be under load: for
example, if some of the units are already connected and others are not yet connected.
❻Connect the Grid Connect Cable to the
AC Mains.
#
WARNING
Connection of the AC cable to the
mains utility grid must only be done by a
qualified electrician.
#
WARNING: Electric shock hazard. Connect in the order given in these
instructions.
The final connection of any branch circuit should always be the grid
connection cable of that branch to the distribution unit of that branch.
#
❼#Connect Grid Connection cable to the distribution unit of the branch.