System information
Enecsys Installation and Operation Manual – Version 1.6 –June 6 2012
25
Connections for the double repeater:
o 5V DC power input from the plug-top power supply
o connection via coaxial cable to the external antenna.
• Pass the DC power cable through the slot in the lower side of the case as shown in the
diagram.
• When the DC power adapter is switched on at the mains, the double repeater will start
working immediately.
• Observe the communication connection quality on the Enecsys gateway Installer
Mode screen – it should now display the check ! symbol.
ATTENTION
After the installation is complete, the gateway should be returned to User mode and
left that way during customary operation. See “Section 4.1.2 Switching Modes”.