System information

Enecsys Installation and Operation Manual Version 1.6June 6 2012
25
Connections for the double repeater:
o 5V DC power input from the plug-top power supply
o connection via coaxial cable to the external antenna.
Pass the DC power cable through the slot in the lower side of the case as shown in the
diagram.
When the DC power adapter is switched on at the mains, the double repeater will start
working immediately.
Observe the communication connection quality on the Enecsys gateway Installer
Mode screen – it should now display the check ! symbol.