Installation guide

Installation manual Intelligent Reliable Power
5
© ENECSYS 2010. All rights reserved.
1.3 Pre-Installation Checks
Before commencing the physical installation of the Micro-inverters installers should ensure that
following pre-installation checks have been completed.
1. The installation company has contacted the Enecsys agent and requested an on-line installer
user account, that the installer user account has been created and that the installer is in pos-
sesion of the following information:
The Enecsys monitoring site URL.
A valid monitoring site username and password.
Note: Creating an installer user account needs to be perfomed only once.
2. That the Enecsys checklist has been used by the installation company to survey the prospec-
tive customer for suitability of the Enecsys instalation. The checklist amongst other informa-
tion ascertains the following information:
Type of roof material where the installation will take place.
That the installation premises have a broadband connection.
That the premises router has an available Ethernet socket.
That there are sufficient AC mains power supply sockets available near the premises router
for the Gateway and within the roof space for a Repeater should one be needed.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.