Installation guide
Installation manual Intelligent Reliable Power
5
© ENECSYS 2010. All rights reserved.
1.3 Pre-Installation Checks
Before commencing the physical installation of the Micro-inverters installers should ensure that
following pre-installation checks have been completed.
1. The installation company has contacted the Enecsys agent and requested an on-line installer
user account, that the installer user account has been created and that the installer is in pos-
sesion of the following information:
• The Enecsys monitoring site URL.
• A valid monitoring site username and password.
Note: Creating an installer user account needs to be perfomed only once.
2. That the Enecsys checklist has been used by the installation company to survey the prospec-
tive customer for suitability of the Enecsys instalation. The checklist amongst other informa-
tion ascertains the following information:
• Type of roof material where the installation will take place.
• That the installation premises have a broadband connection.
• That the premises router has an available Ethernet socket.
• That there are sufficient AC mains power supply sockets available near the premises router
for the Gateway and within the roof space for a Repeater should one be needed.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.