Installation guide

Installation manual Intelligent Reliable Power
3
© ENECSYS 2010. All rights reserved.
Attention: Protection on the AC wiring
Further protection on the AC wiring from the inverters should be provided and may be
required by local and national wiring Regulations. This protection is likely to include Resid-
ual Current Devices, Earth Fault Monitors and Circuit breakers.
Attention: Voltage drop across the wiring
To ensure that the system is operating efficiently, the voltage drop across the wiring should
be verified. This is best done by direct measurement of the circuit impedances, but could be
arrived at by calculations, graphs or tables.
Attention: Installation Testing
Initial verification, before being connected to the grid mains supply, the wiring installation
must be inspected and tested to verify that the requirements of the regulations have been
met. The type and level of the tests must be in accordance with the local and national regu-
lations. The tests and the interpretation of the results must be carried out by suitably quali-
fied persons.
Attention: Enecsys Micro-inverters contain no user-serviceable parts, do not attempt to
open or repair. Opening or tampering with the Enecsys Micro-inverter will void the war-
ranty. If your Micro-inverter(s) fail(s) contact your installer company or the Enecsys help
desk.
Warning: The inverter and metalwork must be earthed in accordance with national and
local electrical standards.
Attention: The Gateway and Repeater/Double Repeater are intended for stationary in-door
use only.