Installation guide

Installation manual Intelligent Reliable Power
25
© ENECSYS 2010. All rights reserved.
6.2 Monitoring
Problem Solution
The installation does not appear as ‘live’ after being set
to ‘live’ on the monitoring site.
Check that all tabs on the monitoring site have been filled in corrrectly and that no ‘red crosses’ are
present.
All of the Micro-inverters show 0W power . Check the visual number on the Gateway Device to make sure all the Micro-inverters are communi-
cating.
Check that
the system is properly connected to the utility grid.
Check you have grid voltage from the AC cable on the roof.
One or only few Inverters showing 0W power Check the visual number on the Gateway device to make sure inverters are communicating.
Cannot Log-In After installation set live by installer and
user account created.
Call the Enecsys Support Function.
Excessive time elapses when downloading monitoring
data.
Click the tab again or refresh the page.
Table 3: Monitoring troubleshooting.