Installation guide
Installation manual Intelligent Reliable Power
20
© ENECSYS 2010. All rights reserved.
5.5 Repeater and Double Repeater
Enecsys Repeaters are employed to improve the communication link between the inverters and
the Gateway. The Enecsys Repeater is a 'plug and play' device; it is quickly and easily installed.
The Enecsys Repeater should be installed within the roof-space of the building and positioned
within easy connection distance of a mains supply AC power source.
For full instructions on how to correctly install a Repeater/Double-Repeater please refer to either
the Repeater Installation Manual or the Double-Repeater Installation Manual.
5.5.1 Install either a Repeater or Double Repeater
1. Select the appropriate location for mounting the Enecsys Repeater.
2. Attach the antenna to the SMA plug on the right hand side of the Enecsys Repeater, screw the
antenna into place in a clockwise direction.
3. Connect the 5V DC power supply jack-plug to the DC power port on the reverse of the Enecsys
Repeater, thread the cable through the semi-circular channel on the back-plate of the Enecsys
Repeater, this will help to keep the cable in place and prevent it from becoming detached.
4. To turn the Enecsys Repeater on connect the supplied 5V DC power supply to the AC mains
supply.
5. The Repeater or Double Repeater should appear on the Gateway screen within five minutes.
6. Check the communication link to establish that the signal strength meets the requirement of
the service. A
symbol must be presented on the screen of the Gateway, this symbol indi-
cates that a sufficient communication has been established.