Installation guide
Installation manual Intelligent Reliable Power
16
© ENECSYS 2010. All rights reserved.
Notes:
• Once the Photovoltaic modules are exposed to daylight and connected to the Enecsys Micro-
inverters, the inverters will start communicating with the Gateway.
• Energy production will only commence once the AC cabling is connected to the AC utility grid.
• Each Micro-inverter has two DC link cables, one male and one female. The DC harness link
cables are terminated with single pole connectors of various types, depending on the installa-
tion and have a nominal length of 150 mm.
The connectors used on all Enecsys Micro-inverters are compliant with all major PV module
manufacturers DC link connectors. These connection types are as follows:
•Multi-Contact MC3.
•Multi-Contact MC4.
• Huber & Suhner Radox.
•Tyco Solarlok System.
Connect the DC cable link harness from the Micro-inverters to the DC cabling from PV module's
junction box.
Depending on the type of connector present ensure that all snap closures are secure and that
push connectors are twist locked.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.