System information

36 Installation and Operation Guide Enecsys LLC 275 Redwood Shores Drive Redwood Shores, CA 94065 www.enecsys.com
The installer will need to drag each inverter serial number to the appropriate module. Refer
to the “PV module / micro inverter serial number form” that was
with stickers during the
installation for their positions in the array design.
Step 3: Check work and launch installation
When you are with dragging the available serials to the modules, save and
You will arrive on the PENDING INSTALLATIONS Screen.
Inspect the information categories for green check marks. If there is an “x” in a column, it
means that the information is not complete. Click on the button to add the required infor-
mation.
If all the information is complete and correct, select the red GO LIVE button on the right.
After you have set the installation live, click CONFIRM.
As soon as the physical installation is completed, the inverters start sending messages to
the gateway and the new system can be seen on the monitoring website.