System information
NNN-NNN r001 Enecsys Installation and Operation Guide 33
Step 7: Adjust section layout.
• Double-clicking on the section will allow the user to edit the individual panel details. If the in-
staller wishes to bypass the automatic inverter serial numbers in the
setup, the inverter
serial numbers can be added manually, panel by panel.
• Adjust, re-size, or reposition the section.
• Double-click section to edit individual PV panels. Use the layout tools to assist with layout
design.
• Later, you will assign inverter serial numbers to the PV panels. The inverters will report their
serial numbers once they are installed and communicating. See “7.2. Adding a new instal-
lation” on page 30.