System information

NNN-NNN r001 Enecsys Installation and Operation Guide 33
Step 7: Adjust section layout.
Double-clicking on the section will allow the user to edit the individual panel details. If the in-
staller wishes to bypass the automatic inverter serial numbers in the
setup, the inverter
serial numbers can be added manually, panel by panel.
Adjust, re-size, or reposition the section.
Double-click section to edit individual PV panels. Use the layout tools to assist with layout
design.
Later, you will assign inverter serial numbers to the PV panels. The inverters will report their
serial numbers once they are installed and communicating. See “7.2. Adding a new instal-
lation” on page 30.