System information

NNN-NNN r001 Enecsys Installation and Operation Guide 21
5.3. Installing one or more single repeaters
5V DC
5V DC
Figure 16. Enecsys Repeater
Install the single repeater in the roof space, directly below the micro inverters. See “Figure
15. Repeaters, Gateway, and Router” on page 20.
It must be installed near an outlet/mains power socket for the plug-top power adapter.
If the installation requires a second single repeater, this should be located on one of the
intermediate
between the repeater in the roof space and the Enecsys gateway on the
ground
as shown in the diagram in section “5.2. Using Repeaters” on page 20.
Figure 17. Repeater scope of delivery
1 Single repeater unit.
1 Plug-top power adapter -- 5V DC 1A
Assorted attachment hardware