System information
10 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com
3.1. Mounting the gateway
• The gateway must be installed indoors near a mains power socket.
• It can be freestanding: rotate out the plastic feet for stability.
• It can be wall mounted using two screws in the position shown in the diagram.
• It can be mounted using adhesive pads in the position shown in the following diagram.
Screw fixing points
Adhesive pad fixing
points (approximate)
9 cm (3.5 inches)
Figure 3. Gateway mounting points
3.2. Connecting the gateway
• The Enecsys gateway requires the following connections:
5V DC power input from the plug-top power supply.
Ethernet connection to the customer’s router.
• When the Enecsys gateway powers up, its screen will display the gateway initial setup
screen (see “Gateway initial display screen” on page 11). Language, installation location,
and date/time are selected: then basic information will display immediately.
ATTENTION
The gateway should be installed in the upright position, either by permanent
attachment or standing upright. This is for optimum antenna performance.
!