Product Manual
- 03 -
Figure 6
Figure 9
Figure 10
Figure 11
Figure 8
Figure 7
4. Attach the sheave to the boom using the cleavis pin. Secure
with cotter pin. See Figure 6.
5. At the very front sides of the boom, install the stop pin and
put the hair cotter pin into the stop pin to secure it in place.
See Figure 7.
6. Attach the hand winch to the mounting plate using
hardware. See Figure 8.
7. Attach the handle to the hand winch. See Figure 9.
cotter
pin
into
the
stop
pin
3. Fasten the boom to the mast with the clevis pins provided.
Secure the clevis pins in place with the hair cotter pins.
Please view the picture below. There are two places
marked as A and B on the left clevis pin. They function to
regulate the crane angle. See Figure 5.
marked
as
A
and
B
on
the
left
clevis
pin
.
They
fu
e
gu
l
ate t
h
e crane ang
l
e. See Figure 5.
A
B
Figure 5
8. Installing the wire rope:
1) Pass the wire rope over the sheave at the end of the boom.
See Figure 10.
2) Insert the steel cable through the square hole from inside to
outside. Insert the steel cable into one side of the cable anchor.
Insert the cable end into the other side of the cable anchor
leaving a large loop outside.
Tighten the nut slightly. Pull and reduce the loop down to the
cable anchor . (See Figure.11)