Instructions for Assembling the 1,000lb/2,000lb Crane
1. There are two kinds of base
:
pedestal and socket. After
installing the base, install the nylon sleeve on its top.
See Figure 12.
2. Assembling the crane:
1) Install the mast in the base. Move the mast side to side to
make sure the bottom of the mast properly seats on the
pin in the bottom of the base. See Figure 13.
2) Fasten the boom to the mast with the clevis pin which is
secured in place by the lynch pin. The lynch pin is fixed
with the carrying handle by the wire rope. Pay attention
that the carrying handle on the boom should be located
on the same side as the handle on the mast. See Figure 14.
3) First adjust the ratchet jack to the greatest length and then
install it when the boom is at horizontal position. Apply the
clevis pins to secure the two ends of the ratchet jack to the
mast and boom respectively. The clevis pins are fastened
tight by the lynch pins. The lynch pins are fixed with
carrying handles by the wire rope. See Figure 15.
4) Slide the boom extension into the boom and secure in place
with the clevis pin and lynch pin provided. The lynch pin is
fixed with the carrying handle by the wire rope. Please see
the assembly drawing below. See Figure 16.
5) Attach the sheave with the clevis pin while using the cotter
pin to prevent the clevis pin from falling off. Bend the cotter