User`s manual
25
6) Slide the handle over the hub and secure it to the hub using the
5/16" bolt and washer.
7) Repeat the process for the other end of the pipe, but install the
white knob instead of the handle.
8) Place the roller assembly onto the front of the pool so that the foot
of the roller bracket is aligned with the top edge of the vertical
cedar plank. Using the oval slots in the foot of the roller bracket,
mark the plank for pre-drilling the lag bolt holes into the wood.
9) Pre-drill the holes for the lag bolts using a 3/16" bit. On one side,
start two of the provided lag bolts (with washers) into the pre-
drilled holes. Slide the roller bracket onto these lag bolts, and
then tighten them to loosely anchor the roller bracket to the cedar
plank.










