Specifications
3
9. Plumbing System
9.1 Head and Holding Tank
9.2 Galley Stove Operation
10. Maintenance
10.1 Gelcoat Surfaces
10.2 Ports and Hatches
10.3 Teak
10.4 Hull Bottom
10.5 Standing Rigging
10.6 Running Rigging
10.7 Lifelines, Pulpits, Stanchions
10.8 Winches and Block
10.9 Engine
10.10 Power Train
10.11 Electrical Maintenance
10.12 Upholstery
10.13 Steering
11. Fitting Out
11.1 Prior to Launching
11.2 After Launching
11.3 Stepping the Spar
12. Laying Up for Winter Storage
12.1 Hauling (Slings)
12.2 Cradle Supp ort
12.3 After Haul Out
12.4 Fresh Water. System
12.5 Head and Holding Tank
12.6 Batteries
2. LIST OF FIGURES
Figure Title Page
1 Deck-to-Hull Joint 4
1A Topside Deck Layout 4
1B Interior Deck Layout 5
2 Chainplate Installation 6
3 Reefing System 8
4 Deck Wiring 15
5 Head System Description 15
6 Plumbing System Description 16
7 LPG System 16
8 Alcohol Stove System 17
9 Lift Strap Locations 21
10 AC/DC Electrical Panel Wiring Diagram (no generator) not avail.
11 DC Panel Wiring Diagram (generator option) not avail.
12 AC Panel Wiring Diagram (generator option) not avail.
13 Cockpit Instrument Panel Wiring 12










