46 Encore — Installation and Service Manual
Section 2 — Installation
BNC connectors found on the back of the frame. Two GSC mezzanines can
be installed in redundant SCBs for redundant GSC operation.
Figure 25. GSC Control Panels, Redundant Operation SCB Cabling
Figure 26. GSC Control Panels, Stand Alone SCB Cabling
The CP (Control Panel) Bus port supports a maximum of 16 control panels
(or devices) on each coaxial cable branch. There are four coaxial cable
branches, so the maximum number of GSC panels allowed is 64. An Encore
System Controller can control a total of 128 control panels so you could
have a maximum of 64 GSC control panels and still control up to 64 Encore
control panels via Ethernet.
The coaxial cable must be 75 ohm (Belden 8281 or equivalent) terminated
into 75 ohms at both ends of the bus. For redundant operation all four buses
must be looped and terminated. The maximum length of a CP Bus is 1500
8153_06_02r0
75 Ohm Terminator
(Required)
75 ohm Terminators
(For redundant operation
loop and terminate all four
BNCs at both ends
even if not used.)
Connect same as example above.
(Daisy chain 16 control panels per
BNC for a total of 64 maximum.)
GSC Control Panels
(Maximum 16 panels per BNC.)
Encore
Control Frame
8103_00_32r0
75 Ohm Terminator
(Required)
75 Ohm Terminators
(For stand-alone operation
required on each BNC used.
Unused BNCs do not need
to be terminated)
Connect same as example above.
(Daisy chain 16 control panels per
BNC for a total of 64 maximum.)
GSC Control Panels
(Maximum 16 panels per BNC.)
Encore
Control Frame