Installation & Assembly
www.encloscreens.com
7
ASSEMBLY INSTRUCTIONS EC18008 
STEP 4: COMPLETE THE FIRST SCREEN
1.  Insert (1) Top Board (F) 
into the grooves of the 
top of the left and right 
post.
2.  Drive (2) 1" stainless 
steel screws into the 
pre-drilled holes in the 
posts to secure the top 
board.
1.  Insert (1) board into the 
grooves of the top of 
the left and right post.
2.  Repeat Step 4.1 until 
all boards have been 
inserted.
STEP 4.1 STEP 4.2
Preview
22
11
F










