Charleston Screen Kit 38" W x 42" H 45 min Approximate assembly time for 2 screens Scan the QR code for an assembly video ASSEMBLY INSTRUCTIONS EC18009 www.encloscreens.com VER.
EC18009 ASSEMBLY INSTRUCTIONS GENERAL INFORMATION IMPORTANT j Check the inside of the larger pieces in your box for other materials packed inside. j When assembling components, place on a non-abrasive surface (i.e. shipping box) to avoid scratching. j We recommend an area approximately 5’x 8’ for unobstructed assembling. j You should not need to use excessive force when assembling components.
ASSEMBLY INSTRUCTIONS EC18009 Detailed Product Dimensions & Specifications 38 3/4 in 36 1/4 in 40 3/4 in 2 5/8 in 42 1/8 in 1 1/4 in 12 in www.encloscreens.
EC18009 ASSEMBLY INSTRUCTIONS STEP 1: LAY OUT MATERIALS A B Post Cap (4) Wood Assembly Spacer (2) C D Top View G Top View Board (20) 5/8" x 25/8" x 38" H Left Post (2) 1 1/4" x 1 1/4" x 42" Right Post (2) 1 1/4" x 1 1/4" x 42" E F Joiner Clip (2) 1/13" x 3/4" x 1 3/4" I Spacer (36) 7/8" x 11/9" x 11/9" 4 Post Anchor (4) 7/8" x 1 1/9" x 17" 1” Stainless Steel Screw (20) www.encloscreens.
ASSEMBLY INSTRUCTIONS EC18009 STEP 2: INSERT BOARD STEP 2.1 STEP 2.2 b Orient the Left Post (C) and the Right Post (D) as shown below. b Insert (1) Board (G) into the grooves of the left and right post. Preview C D G Ensure Screw Holes Align NOTE: The end of each post marked with a sticker is the top. www.encloscreens.
EC18009 ASSEMBLY INSTRUCTIONS STEP 3: FASTEN POST ANCHORS STEP 3.1 b Use (2) Wood Assembly Spacers (B) to align the board with the four pre-drilled post holes. The spacers can be removed after the height of the bottom board is established. Preview Flush B Preview STEP 3.2 1. Insert (2) Post Anchors (F), into the posts until the pre-drilled holes in the anchors and posts align. 2. Drive (4) 1" Stainless Steel Screws (I) into the pre-drilled holes in the posts to secure the board and post anchors.
ASSEMBLY INSTRUCTIONS EC18009 STEP 4: COMPLETE THE FIRST SCREEN STEP 4.1 STEP 4.2 1. Orient and drop (1) Spacer (E) into both of the post channels as shown. 2. Insert (1) board into the grooves of the left and right post. 1. Repeat Step 4.1 until all boards have been inserted. 2. Drive (2) 1" stainless steel screws into the pre-drilled holes in the posts to secure the boards. 1 Preview 1 Orient facing open channel E 2 www.encloscreens.
EC18009 ASSEMBLY INSTRUCTIONS STEP 5: ASSEMBLE THE SECOND SCREEN STEP 5.1 b Repeat Steps 2-4 in order to assemble the second screen. STEP 6: INSTALLING THE SCREEN IN THE GROUND STEP 6.1 1. Move the screen to its final location and identify where the posts are located. Attempt to push the unit into the ground as illustrated. b (Optional) 2. If your ground is too hard, loosen the top 6" or 7" of the ground with a claw hammer as illustrated. 3. Add water to loosened soil. 4.
ASSEMBLY INSTRUCTIONS EC18009 STEP 6.2 b (Optional) b If your ground is too hard, dig a hole 8" in diameter and 14" deep to accommodate one post from each screen as shown below. 8" 14" STEP 6.3 b Level the screen, as necessary, backfill excavated dirt, and tamp if needed. www.encloscreens.
EC18009 ASSEMBLY INSTRUCTIONS STEP 7: CONNECT THE SCREENS STEP 7.1 1. Straight Line Application: Connect the screens as shown below using Joiner Clips (H) and 1" stainless steel screws. 2. Corner Application: Connect the screens as shown below using Joiner Clips (H) and 1" stainless steel screws. H 1 H H 2 H 10 www.encloscreens.
ASSEMBLY INSTRUCTIONS EC18009 STEP 8: INSTALL POST CAPS STEP 8.1 b Install (4) Post Caps (A) into the tops of the posts. A www.encloscreens.
www.encloscreens.com support@encloscreens.com 704-892-5222 877-234-6196 6935 Reames Rd. Ste. K. Charlotte, NC 28216 ASSEMBLY INSTRUCTIONS EC18009 VER.