Instructions / Assembly
www.encloscreens.com
10
ASSEMBLY INSTRUCTIONSZP19036
b Level the screen as necessary,
then backll and compact
the excavated dirt.
STEP 4.5
STEP 4.6
b If your ground is really hard, you may need
to dig a hole large enough to accommodate
one post from each screen into the same hole.
Backll and compact dirt.
Level
8” diameter
x 12" deep.