User`s manual

Initial Setup 2-7
December 2003
Powering On and Off
To operate the TransPort, the power cord must be plugged into
line voltage or the battery must be charged as described
previously.
To turn the TransPort on, press [ON] which is in the upper-right-
hand corner of the keypad. Immediately upon power up the
TransPort displays the GE Panametrics logo and the software
version. The meter will then perform the following self checks
and displays their conditions:
EPROM checksum
RAM test
NOVRAM test
Backup battery test
Time and date test
If the meter fails any of these tests, contact GE Panametrics.
!WARNING!
If the meter fails the backup battery test, you
must send the unit back to the factory for a
battery replacement. Make sure you keep the
NICAD batteries charged until you are ready to
ship the unit back to the factory. Before
shipping, print out all the log and site data.