Installation Guide

Page 13 of 67 pages
Document # E.0015.16.03 406984
Connector J7 (marked on the Control Panel PCB) is an RJ45
connector. Connect it to the system computer (if any).
2.4 Connector J9 (Terminal Block)
Connect the first GND terminal to the ground for the wired zone.
Connect the WIRED ZONE terminal to the wired zone.
Connect the PGM-1 and PGM-2 terminals to the PGM units in the
system.
Connect the EARTH terminal to the earth for the PGM units in the
system.
Connect the 9V AC-1 and 9V AC-2 terminals to the 9V mains
transformer.
Connect the second GND terminal to the ground for the 9V mains
transformer.
The remaining terminals (Telco Tip, Telco Ring, Net Tip, Net Ring)
are already connected (see Section 1.2 above).
Check all connections. Plug 9V mains transformer into 110V mains.
System opening screen will be displayed. Proceed to Section 2
below.