User's Manual

Follow these steps to install each remote unit.
For external antenna use, connect the Antenna to the remote using 50
cable with an SMA-type connector.
Remove the cover on the Remote fiber connector. Using a dust free air
source, clean the fiber connector.
Remove the plastic cover on the fiber and clean the connector tip.
Connect the fiber(s) to the remote.
Connect the DC power cable to the remote.
Ensure that the power switch on the main power supply is in the “off”
position and connect the power to the Remote observing the polarity
markings.
Mechanically secure the Remote in its designated location.
After power-up, the front panel LED should be Amber for ten seconds and
then turn green (assuming the Hub is connected properly).
3.9 System Verification and Initialization
If all the previous steps have been followed carefully, the EkoLite II system is
now ready for verification and initialization. Connect to the Hub via serial cable
or modem.
Note that if no master controller is present, the user will connect to the “HUB
RS232” connector located on the rear of each Hub. If the Master Controller
module was purchased, the user can connect to the “Master RS232” port located
on the front of the Master Hub.
The standard terminal settings are:
9600 Baud
8 Data bits
1 Stop bit
No flow control
No Parity
If you are unfamiliar with serial communications, please refer to the Operator’s
Manual for a step by step guide to connecting to the Hub.
At the Hub, apply power to the system by turning the power to the “on” position.
The Hub LEDs should be green if everything is functioning properly. If any of the