User's Manual

Table Of Contents
SYSTEM DESCRIPTION, INSTALLATION, AND MAINTENANCE MANUAL
eNfusion® HSD-440 Mark 2 Terminal
23-15-30 3-17
3 JUN 10
D. PIM Test Results
(1) PIM Test Overall Status
At the end of the PIM test, the HSD-440 Mark 2 Terminal displays the test results.
Figure 3-6 shows an example of the test results.