User's Manual
Table Of Contents
- toc
- TRANSMITTAL INFORMATION
- INTRODUCTION
- 1. How to Use This Manual (TASK 23-15-30-99F-801- a 01)
- A. General (Subtask 23-15-30-99F-001- a 01)
- B. Observance of Manual Instructions (Subtask 23-15-30-99F-002-
- C. Symbols (Subtask 23-15-30-99F-003- a 01)
- D. Units of Measure (Subtask 23-15-30-99F-004- a 01)
- E. Illustration (Subtask 23-15-30-99F-005- a 01)
- F. Application of Maintenance Task Oriented Support System (MTOS
- 2. Customer Support (TASK 23-15-30-99F-802- a 01)
- 3. References (TASK 23-15-30-99F-803- a 01)
- 4. Acronyms and Abbreviations (TASK 23-15-30-99F-804- a 01)
- 5. Process Verification (TASK 23-15-30-99F-805- a 01)
- 1. How to Use This Manual (TASK 23-15-30-99F-801- a 01)
- DESCRIPTION AND OPERATION
- TESTING AND FAULT ISOLATION
- 1. Planning Data (TASK 23-15-30-99C-801- a 01)
- 2. Procedure (TASK 23-15-30-700-801- a 01)
- A. Job Setup (Subtask 23-15-30-810-001- a 01)
- B. BITE (Subtask 23-15-30-810-002- a 01)
- C. LEDs (Subtask 23-15-30-810-003- a 01)
- D. Self-Test (Subtask 23-15-30-810-004- a 01)
- E. Unit Software Load Procedure (Subtask 23-15-30-810-005- a 01)
- F. Fault Isolation (Subtask 23-15-30-810-006- a 01)
- G. Job Close-up (Subtask 23-15-30-810-007- a 01)
- CLEANING
- INSPECTION/CHECK
- 1. Planning Data (TASK 23-15-30-99C-803- a 01)
- 2. Procedure (TASK 23-15-30-210-801- a 01)
- A. Job Setup (Subtask 23-15-30-210-001- a 01)
- B. General Inspection/Check Procedure of the A350 SDU and SCM (S
- C. Instructions for Continued Airworthiness, FAR 25.1529 (Subtas
- D. Inspection/Check Schedule (Subtask 23-15-30-210-004- a 01)
- E. Unscheduled Maintenance (Subtask 23-15-30-210-005- a 01)
- F. Repair Requirements (Subtask 23-15-30-210-006- a 01)
- G. Job Close-up (Subtask 23-15-30-210-007- a 01)
- REPAIR
- FITS AND CLEARANCES
- SPECIAL TOOLS, FIXTURES, EQUIPMENT, AND CONSUMABLES
- REMOVAL
- INSTALLATION
- 1. Planning Data (TASK 23-15-30-99C-808- a 01)
- 2. Procedure (TASK 23-15-30-400-801- a 01)
- A. Job Setup (Subtask 23-15-30-400-001- a 01)
- B. Installation Data (Subtask 23-15-30-400-002- a 01)
- C. Unpacking and Inspecting Equipment (Subtask 23-15-30-400-003-
- D. Customer Acceptance Procedure (Subtask 23-15-30-400-004- a 01
- E. Installation Procedure (Subtask 23-15-30-400-005- a 01)
- F. Test (Subtask 23-15-30-400-006- a 01)
- G. Job Close-up (Subtask 23-15-30-400-007- a 01)
- STORAGE (INCLUDING TRANSPORTATION)
- REWORK
- APPENDIX A (RMA)
- tables
- Table 1. Applicable Components
- Table 2. Revision History
- Table 3. MTOSS Function Code Definitions
- Table 4. Verification Data
- Table 5. SDU Leading Particulars
- Table 6. SCM Leading Particulars
- Table 7. Equipment Description
- Table 8. SDU Rear Connector Pin Deviations
- Table 9. SCM D-Type Connector Pin Assignment
- Table 10. SDU Functional Interfaces
- Table 11. Special Tools, Fixtures, and Equipment
- Table 12. Consumables
- Table 13. LED Status Indicators Table
- Table 14. Special Tools, Fixtures, and Equipment
- Table 15. Consumables
- Table 16. Special Tools, Fixtures, and Equipment
- Table 17. Consumables
- Table 18. Special Tools, Fixtures, and Equipment
- Table 19. Consumables
- Table 20. Fits and Clearances
- Table 21. Thread Size and Torque Data
- Table 22. Final Torque Data
- Table 23. Special Tools, Fixtures, and Equipment
- Table 24. Consumable Materials
- Table 25. Special Tools, Fixtures, and Equipment
- Table 26. Consumable Materials
- Table 27. Special Tools, Fixtures, and Equipment
- Table 28. Consumables
ABBREVIATED COMPONENT MAINTENANCE MANUAL
1458-A-1101 / 1458-A-1300
F. Fault Isolation (Subtask 23-15-30-810-006-A01)
(1) Testing
(a) Power-Up Test
1
The power-up test verifies basic SDU functions and uses the front-panel LEDs
to communicate the results.
2
The fault LED indicates several possible internal SDU system problems, not specific
problems, refer to Table 13.
Table 13. LED Status Indicators Table
Power LED State Fault LED State Indicates Action
ON for 60 seconds during
boot-up, then OFF
ON Normal operation during
boot-up
-
OFF OFF Normal operation
-
OFF ON LRU fault Use Interactive Mode
BITE via CMS to confirm
fault, remove the LRU
and return it to the factory
OFF Flashing System fault, not
necessarily with the
A350 LRU
Use Interactive Mode
BITE via CMS to isolate
fault, use confirmation
method of suspect LRU
to confirm fault
Flashing Flashing Self-test
-
3 Some of the possible LRU faults indicated by the lit fault LED include:
• Software image incorrect or corrupted
• Internal busses non-operational
• Internal processors non-functional.
4
To find th
e equipment or connection that failed, check the interactive mode BITE
pages. So
me examples of possible SDU system faults indicated by the flashing
fault LED
includes:
• Strapped configuration does not match the capabilities of the A350 SDU system
or the configuration in the ORT - check the wiring and strapping
• Code images in the SDU do not match the expected configuration - check the
software version and your configuration
• RF path from the SDU to D/LNA failed - check wiring and cable loss settings
• USIM not detected.
(b) Troubleshooting Guidelines
1
If the front-panel LEDs signal that the SDU is operating normally and some services
are still not available:
• Verify your SATCOM system - view to satellite, SCM installed
EFFECTIVITY
ALL
23-15-30
Page 53 of 70
5 Oct 2012
© Honeywell International Inc. Do not copy without express permission of Honeywell.
Interim DRAFT for FCC Approval Purposes
Do Not Use for Maintenance
10-Feb-2013