Specifications
operaTIon
EMPYRE ELITE XT INSTALLATION AND OPERATION MANUAL 19
Takethefollowingprecautionstoprotecttherebrickand
maintain optimal performance.
1. Do not carelessly throw heavy pieces of wood onto the
brick.
2. Gently rake ashes out of secondary burn chamber.
3. Donotdamagebrickwhilestirringthere.
4. Do not attempt to cool down hot bricks quickly.
5. Do not run furnace with pieces of brick missing.
6. Do not alter the brick and insulation layout. This layout
has been carefully engineered to achieve the best
performance.
Blower Draft Setting
Theblower and apperunitapopeningsettingsarepre-
determined by the factory and must NOT be altered. Altering
these components could cause damage to the furnace and
void the warranty. To replace any of these components you
must contact your Empyre Elite XT dealer.
NOTE: This is not a natural draft furnace. It is a forced air
furnacewheretheblowercontrolsthere.
Doors
TheEmpyreEliteXTdoorshaveanadjustablehingeand
latch.Adjustdoorstomaintain a tight gasketseal.Keep
doors closed and maintain all door seals in good condition.
Exhaust Exit Lever Operation
When the exhaust exit lever above the loading door is in the
right hand position, the furnace is in its normal operating
mode. When the lever is moved to the left, the furnace is
now in the loading mode. In the loading mode the exhaust
exitisopenatthereartopofthereboxandairisdirectedin
frontofthebafe.Theblowerwillonlyrunforatimedperiod
and then shut off. To reactivate the timer, the lever must
be moved to the full right position and then back to the left
position, or switch furnace off and back to on.
Loading procedures:
1. Move lever to the left hand side and wait momentarily.
Slowly open the loading door.
2. Raketheashandloadtherebox.Note:ifblowershuts
down before loading is complete, reactivate by moving
the lever fully to the right and then back to the left.
3. Close door securely and move lever fully to the right.
Note: if the lever is not fully to the right the furnace
WILL NOT operate.
To maintain optimal performance:
1. Do not leave loading door open for extended periods of
time,especiallywhenthereisveryhot.
2. Do not force the loading door open beyond the stop.
Power Outages
The Empyre Elite XT furnace, unlike a gas or oil red
appliance, does not stop generating heat when the power
is interrupted even though the blower automatically shuts
offcausingtheretodiedown.Asaresulttheheattransfer
uidinthefurnacemayoverheatandboiloffthroughthe
vent.Whenpowerresumesbesuretochecktheuidlevel.
Operation Do’s and Don’ts
1. When loading wood keep the loading door open for the
least amount of time as possible.
2. After loading wood, when wood is burning hot DO NOT
open the loading and ash doors for several hours. This
will avoid hot discharge from the doors and keep chimney
temperatures at a proper operating level.
3. When wood is burning hot DO NOT unneccesarily shut
off the furnace and then turn it back on. Wait at least 10
minutes before turning it back on. This will avoid back
pressure coughing through the chimney when the furnace
comes back on.
4. DO NOT open ash door when the wood is burning hot or
justafterthefurnaceshutsoff.Ifnotsure,openloading
door rst before ash door. This will avoid hot discharge
from the open door.
5.DONOTllthereboxwithverydrywood.Extremelydry
wood will burn excessively fast which will cause smoke,
back pressure and coughing through the chimney.
6. Reloading when the wood is burnt down to only ashes
(the same applies for starting a new re): start re with
paper and small pieces of wood, then continue adding
bigger pieces. After 10 minutes, reposition the wood.
In some instances you may need to reposition the wood
several times. Important: DO NOT have door open or lever
to the left more than necessary. If there is only smoke and
the air from the open door ignites the re, the slots are
plugged and the wood needs to be repositioned to ensure
airisowingintothesecondaryburnchamber.
When the brick has cooled, it will take extra effort to get a
goodregoingasthewoodwillbridgemore.
7. Always keep some hot wood coals on the brick. As
needed, level off the bed of coals with the rake before
reloading.










