Owner`s manual

28188-1-0711Page 10
4. Insertblowerassemblyintointerior, bottom of rebox. Posi-
tion blower assembly so that you align the notch on back of
blowerassemblywiththecenterscrewonreboxback,then
pushtheblowerassemblyagainstreboxback.Theblower
wheelmustbecenteredwiththebackwalloftherebox.The
magnets on the back and bottom of blower assembly will suf-
cientlyholdblowerassemblyinplace.
Note: Foreldinstallationofblowerassembly,itmaybeeasierto
remove rear cover panel to install blower. This eliminates
the need to remove brick liner panels, but the blower would
havetobeinstalledpriortoinstallingthereboxintoawall
or chase. See Figure 15.
5. Once the blower assembly is in position, locate the plug but-
toninthetoprightrearcorneroftherebox.Removetheplug
with a standard screwdriver and discard plug.
6. Next,ndthefancontrolswitchandwireassembly.Feedthe
wiresthroughthe hole atthetopof therebox,andsecure
the fan control switch with (2) #6 screws provided. See Figure
16.
7. Thefancontrolwireswillslidedownbetweenthereboxand
outer wrap near the blower assembly. See Figure 16.
8. One fan control wire will have a 1/4” female terminal that must
be attached to the open terminal on the blower motor. See

9. The other fan control wire has a 1/4” male terminal. Attach this
terminal to the open terminal on the blower power cord. See

10. Route the wires away from moving parts of the blower assem-
bly and retain wires together near the blower motor using the
plastic purse clip provided.
11. To complete the installation, plug the power cord into the junc-
tionboxreceptacleattherightrearcornerofthereboxouter
wrap. 
12. If room permits, the power cord can be located from the out-
side of the unit looking through the junction box access hole
(with the junction box removed), then plug up the power cord
before reinstalling the pre-wired junction box.
13. Once all connections are made electrically, it is recommended
that you test the blower fan control operation by turning on
power to the blower (Caution: 110 Volt). Then apply heat to
thefancontrolswitchinsidethereboxwithalighterormatch
until blower is activated. Once blower is activated, check for
proper operation. Do not place hands near blower assembly
or other wiring while power is on.
14. Replace blower access plate and/or reinstall the brick liner
panels if provided.
15. This completes the installation of the optional FBB5 Blower kit
accessory.
Note: This blower is equipped with a heat activated fan control
switch.Blowerwilloperatewhenthereboxwarmsup,and
willturnoffautomaticallywhenthereboxcoolsdown.
REAR COVER PANEL MAYBE
REMOVED TO INSTALL BLOWER
REINSTALL COVER AFTER
BLOWER IS INSTALLED
Figure 15
NOTE: HOOD AND BRICK PANELS REMOVED FOR CLARITY
Figure 16

BLOWERPOWERCORD