Owner`s manual

27061-2-0711Page 12
Completion of Air Kit installation
1. Determinethe lengthof4” Dia.rigidor ex ductconnector
(installersupplied)youwillneedfromtherebox/replaceto
the exterior surface of the outside wall, where the air kit hood
will be installed. Add a few extra inches to the length to allow
for easier attachment of the outside duct connection prior to
securing the outside rain cap hood to the building.
2. Secure the 4” dia. duct to the Air Door assembly collar on the
rebox/replacewithbandclampsorscrews.
3. Run the other end of the duct through the exterior wall cut-
out.
4. From the outside of the building, connect the duct to the collar
on the outside air vent assembly with band clamp or screws
to secure.
5. Mate the outside rain cap hood over the air vent, seal with
caulk as necessary, then secure with screws provided to the
exterior wall surface. See Figure 22 and 23.
6. Figure 24 illustrates the various options for installation of the
air duct run possibilities.
OUTSIDE
HOOD
4” DIA. AIR DUCT
CONNECTOR
(INSTALLER SUPPLIED)
OUTSIDE PLATE/VENT
SCREEN ASSEMBLY
AIR DOOR
ASSEMBLY
FIREBOXOR
FIREPLACE
Figure 22
Figure 23
Caulk and Install Duct Termination
WALL
DUCT TERMINATION
RAIN CAP
CAULKING
Figure 24