Owner`s manual

27061-2-0711Page 10
OPTIONAL FRESH AIR KIT INSTALLATION INSTRUCTIONS
FOR DELUXE AND PREMIUM FIREBOXES
Figure 15
4. Next, with the vise grip attached, feed the long control rod
through the small rectangular opening at the left side of the
reboxface.Carefullypositiontherodandbracketsothatthe
bracketcan be secured to theinsideopeningoftherebox
with two screws. See Figure 16. Do not remove vise grips at
this time.
Figure 16
5. Working from the side cutout opening, place the slightly
opened air door assembly into the cutout opening as shown
in Figure 17.
Figure 17
6. While holding the door assembly in your left hand, grasp the
vise grip (attached to the long control rod). Rotate and move
the control rod around until the inside end of the rod is mated
withtheholeinthefrontangeofthemovableairdoor.See
Figure 18.
The optional BVA1 Fresh Air Kit is designed to introduce outside
airtothereplaceorreboxasdesired.
Itmustbeinstalled priorto,or atthetime ofreplaceor rebox
installation to framing.
The Fresh Air kit must be installed prior to the installation of wall-
boardorothernishingmaterialsaroundtheunit.
Tools needed: Gloves, Metal snips, Vise-Grip, ¼” Nut Driver,
Standard Screwdriver
Caution: Sharp edges
Air Door Installation for Vent Free Firebox Models:
VFP(32,36,42)FB
1. Begin by removing the rectangular cutout located on the left
sideoftherebox.Useglovesandsheetmetalsnipstocre-
ate the opening for the Air Door assembly to install into. See
Figures 13 and 14.
Figure 13
TO INSTALL BVA-1 FRESH AIR KIT,
REMOVE RECTANGULAR CUT-OUT WITH
SHEET METAL CUTTERS
Figure 14
2. Movethelefthandcurtainscreentothecenteroftherebox
opening.
3. Grasp the long control rod lever with control bracket (items 7
and 8 in Fresh Air Kit Parts List) securely with a vise grips
as shown in Figure 15.