Installation Guide
2-4. Finally you need to do a final test for drainage. 
Ensure that the thin masking plastic adhered to your bath during manufacture has 
been removed.Fill the Bath with water and check that ALL the water flows freely to 
the waste outlet. 
A small amount of water may pool owing to surface tension. 
2-5.  Apply  a thick layer  of  silicon sealant  around  the  bath outline allow it set  24 
hours.This  installation  guide,the  installation  of  waste  connection  should  be  only 







