Free-Standing Bathtub Installation Instructions
Contents: Product drawing ....................................1 Installation steps....................................2 Cleaning and maintenance tips...............3 Caution...................................................4 1.
2.Installation Steps 2-1. Remove the Bath from the carton. Ensure the Bath does not come into contact with rough surfaces. Rough surfaces will scratch your Bath. Always ensure that the Bath is placed on cardboard or carpets during installation. Place the Bath in position for installation.
2-2. Adjust the feet make sure the Bath is level. Only if the Bath is level will all water drain to the waste outlet.Please ensure legs are adjusted in line with the base of bath.Check the sits flat. 2-3. Connect the Bath to the waste outlet.
2-4. Finally you need to do a final test for drainage. Ensure that the thin masking plastic adhered to your bath during manufacture has been removed.Fill the Bath with water and check that ALL the water flows freely to the waste outlet. A small amount of water may pool owing to surface tension. 2-5. Apply a thick layer of silicon sealant around the bath outline allow it set 24 hours.
suitably by qualified person. 3. Cleaning and maintenance tips 3-1. In time to clean. To clean convenient, it is suggested that immediately wash the bath after taking a bath. This time will be expanded easily to remove dirt and soapsuds, after a long time will accumulate in the tub wall and difficult to remove, especially in places where hard water quality in high calcium content, after a long time will form macular at the bottom of the tub wall and faucet. 3-2. Cleaning method.
4.3. Drunk , patients high blood pressure or heart disease use with caution.if any uncomfortable please come out immediately.