Datasheet

4.1. TEST CONDITIONS
4.1.1 The battery to be tested is the product within one month after being received by customer.
4.1.2 Ambient conditions:
Temperature +20 ±5℃℃
Humidity +65%±20%
4.2 Testing Tools
4.2.1 Voltage meter:
0.5 level or higher as required in IEC51/IEC485. Internal impedance exceeds 10K/V.
4.2.2 Current meter:
0.5 level or higher as required in IEC51/IEC485. Internal impedance should be less than
0.01/V(including wires).
4-2.3. Micrometer caliper:
With precision of 0.02mm.
4-2.4. Internal impedance meter:
Alternating current of 1000HZ, connector measuring equipment with sin wave of 4.
4-2.5: Impedance loaded meter:
Value of impedance is with +5% error allowed (including external wires).
4.2.6 Incubators Accuracy ±2
4.3 Test methods and benchmarks
Item Test Method Benchmark
1Appearance:
eyeballing
batteries shall be free from
any stains; scratches or
deformations, which may
reduce the commercial value
when visually inspected
2Size: caliper measurement
The size shall comply with the
specified size as the attached
drawing
3Insulate
impedance
measured with a Megger overpack
and battery electrode between the
degree of insulation
outer sleeve shall exceed 10
M
4Weight using disk-scale measurement approximate 29.5 g
5Charge
Voltage
Following a period of discharge at
0.2CmA down to a terminal voltage
of 1.0V, standard charge, the cell or
battery shall be checked at 5 minutes
before finish charging
The voltage shall be less than
1.6
V
6Open circuit
voltage: (O.C.V.)
Following a standard charge period,
the open circuit voltage of the cell or
battery shall be checked within 1
hour.
The O.C.V. shall exceed 1.25
V per cell.
7Closed
circuit voltage:
(C.C.V.)
Following a standard charge period,
the closed circuit voltage of the cell
or battery shall be checked with a
0.86 Ω per cell load within 1
The C.C.V. shall exceed 1.2
V per cell
想的更多,做得更好! Think more, do better