Technical information
C6.1.7/0609-1110/E 17
4.4 Checks before starting up and during operation
Please check that all Rotalock valves are fully opened.
Check that the electrical panel is closed.
After starting up and operation conditions are stabilised, we recommend to check the oil
level in compressor(s) and if needed to add oil to ensure a sufficient oil level (halfway up
the sight glass).
5 Maintenance & repair
De-energize the unit before any intervention.
Close Rotalock valves to isolate the compressor from the system and unscrew the flare
Rotalock connector from the compressor.
Release the compressor mounting parts and then lift it to replace with a new compressor.
For more detailed instructions, please refer to the compressor application guideline.
6 Certification & approval
The piping is in compliance with the Pressure Equipment Directive 97/23/EEC (Art.3 §3 -
Sound Engineering Practice).
Components of the units carry a CE mark as far as required and thereby establish
conformity with the relevant directives.
Conformity Declarations for components are available as far as required.
The units are in conformity with the low voltage directive. The applied harmonised standard
is EN 60335-1 (Safety Household and Similar Electrical Appliance, Part 1: General
Requirements).
To incorporate these products into a machine the Manufacturer's Declaration of
Incorporation has to be respected.
7 Dismantling & disposal
Removing oil and refrigerant:
Do not disperse in the environment.
Use the correct equipment and method of removal.
Dispose of oil and refrigerant properly.
Dispose of unit properly.
Safety
instructions
Product
description
Installation
Starting up &
operation
Maintenance &
repair
Certification &
approval
Dismantling &
disposal