user manual

INDEX
Printed in U.S.A. Copyright ASCO Power Technologies, L.P. 2007
A
Alarm Reset pushbutton, 1–4, 2–2
auxiliary circuits, 1–2
B
bus connections, 1–2
bypassing the ATS, 3–1
C
catalog number, cover
cleaning, 2–1
closed–transition transfer, 1–4
connections
line, 1–1
controller
disconnecting, 2–1
see Controller User’s Guide
E
electrical operation, 1–4
Emergency Source Accepted light,
1–3
Engine Control selector switch
Auto position, 2–1
engine starting contacts, 1–2
Extended Parallel Time light, 2–2
F
Failure to Synchronize light, 2–2
foundation, 1–1
frequency, generator, 2–2
functional test , 1–3, 1–4
H
harness, 1–2
disconnect plugs, 2–1
HELP
customercare@asco.com
800–800–ASCO
I
inspection, 3–1
installation, 1–1
isolating the ATS, 3–2
L
lights, 1–3, 1–4
lubrication, 2–1
M
maintenance, preventive, 2–1
maintenance handle, 2–2
warning, 2–2
manual load transfer, 2–2
warning, 2–2
N
nameplate, cover
Normal Source A ccepted light, 1–3
O
operation
electrical, 1–4
manual, 2–2
warning, 2–2
P
parts, 2–1
phase rotation check, 1–3
preventive maintenance, 2–1
problem, 2–2
R
rating label, cover
removal of shipping angles, 1–1
removal of shipping skid, 1–1
replacement parts, 2–1
return to service, 3–3
S
service
ASCOServices,Inc.(ASI),21
settings
see Controller User’s Guide
shipping angles, 1–1
warning, 1–1
shipping skid, 1–1
T
test, functional, 1–3, 1–4
testing power cables, 1–2
time delays, 2–1
see Controller User’s Guide
TS Locked Out light, 2–2
Transfer Control selector switch
Retransfer Delay Bypass, 1–4
Transfe r Test, 1–4
Transfer Switch Connected To
Emergency light, 1–4
Transfer Switch Connected To
Normal light, 1–4
transfer test, 1–4, 2–1
transfer to emergency, 1–4, 2–1
transfer to normal, 1–4, 2–1
troubleshooting, 2–2
V
voltage checks, 1–3
voltage, pickup and dropout settings
see Controller User’s Guide