Specification Sheet
S3K Series Instruction Manual • 7Visit our Web site at www.solahd.com
3.0 Pre-Installation
Inspect the UPS upon receipt. Damage that may have occurred in transit is not
covered under the warranty. If shipping damage is present, please contact your
local carrier and SolaHD distributor immediately.
Note: The packaging material is recyclable. Please reuse or dispose of it in a
responsible manner.
4.0 Installation
4.1 Installation Requirements
• Install the UPS in a protected area with adequate ventilation and free from
excessive dust.
• Do not expose the UPS to corrosive air.
• Avoid direct sunlight, rain and high humidity.
• Do not operate the UPS where the temperature and humidity are out of the
specied limits (operating temperature: 0°C to +40°C; humidity: 0% to 95%).
Keep away from re and extremely hot locations.
• Maintain a clearance of 4 inches (100 mm) between the UPS rear panel and
the wall and 1 inch (25.4 mm) between the UPS sides and the wall. Keep the
air inlets unobstructed to facilitate ventilation and heat dissipation.
• Do not stack materials on top of the UPS.
• Never leave the UPS on an uneven surface.
4.2 Installation Instructions
4.2.1 Connect to Utility Power
Connect the UPS line cord to the IEC INPUT receptacle on the rear panel of the
UPS (line cord already attached on S3K1600 models). Connect the other end of
the line cord to the ac input power outlet.
4.2.2 Charge the Battery
The UPS charges its battery whenever it is connected to utility power, even when
the unit is off. For best results, charge the battery for 8 hours before initial use.
4.2.3 Turn On the UPS
Press the ON/TEST button.