Instruction manual

NGA 2000 MLT Hardware
INSTALLATION
5 - 2
Emerson Process Management GmbH & Co. OHG
Instruction Manual
90002929
07/2006
GENERAL
To stay in compliance with regulations regarding electromagnetic compatibility it is recommended
to use only shielded cables, as optionally available from Emerson Process Management or
equivalent. Customer has to take care that the shield is connected in proper way. Shield and signal
connector enclosure need to be conductively connected, submin-d-plugs and sockets must be
screwed on the analyzer.
Using external submin-d-to-terminal adaptor elements (option) affects electromagnetic compat-
ibility. In this case the customer has to take measures to stay in compliance and has to declare
conformity, when required by legislation (e.g. European EMC Directive).
The mains socket has to be nearby the power supply unit and easily
accessible! Disconnecting from mains requires unplugging the power plug!
To comply with the CE mark requirements, analzyers requiring DC power
supply must be supplied by a power supply unit of type UPS 01 T, DP 157,
SL5, SL10 (DP 157 rack installation only) or equivalent units. Equivalent
units must provide SELV output voltages!
Verify proper polarity when connecting DC 24 V operated analyzers !